Listing data is aggregated from public sources — evidence, not an appraisal.
No listings are recorded in this building yet.
Unit-level roll detail isn't available for this building yet. The assessment roll records it at the building level only.
CREUSER SOUS LE BÂTIMENT ET FAIRE DALLE DE PROPRIÉTÉ SANS AUCUN AUTRE TRAVAUX A L'INTERIEUR NI À L'EXTERIEUR.
A L'ARRIERE, ENLEVER LA GALERIE VITREE ET REFAIRE LE PLANCHER DU BALCON, FASCIA ET SOFFITE EN PLANCHES DE CEDRE. AJOUTER NOUVEAU GARDE-CORPS EN ACIER TEL QUE PLANS.
AU 2E ETAGE DU HANGARD, AJOUTER UNE FENETRE SUR MUR ARRIERE.
SUR LE CONTOUR DES OUVERTURES EN FACADE REMPLACER LE FINI EN_ALUMINIUM BRUN FONCE PLUS 2 PORTES DE FACADE BLANCHE
INSTALLATION DE 11 PIEUX POUR STABILISATION DE LA FONDATION.