Listing data is aggregated from public sources — evidence, not an appraisal.
“Dwellings on the roll” is what the municipal assessment roll declares for the whole building. “Units seen on the market” counts the distinct units listed here at least once in the window. “Roll entries” below counts the roll's own rows, which also cover parking spaces and lockers — so it can exceed the dwelling count.
No listings are recorded in this building yet.
| 001-0001 | 1,123 | $640,600 | $570 | |
| 001-0002 | 2,020 | $1,058,900 | $524 |
En sous-oeuvres, ajouter 13 pieux sous les fondations afin de solidifier la structure (9 pieux le long du mur latéral nord et 4 pieux le long du mur latéral sud). Travaux de structure
VIDE SANITAIRE : AJOUT D'UNE POUTRE D'ACIER SUR 4 MICRO-PIEUX D'ACIER DANS L'AXE CENTRAL LONGITUDINAL POUR LA REPRISE DES CHARGES SUPPORTÉES DE LA FONDATION EN MOELLONS ADJACENTE.
FAÇADE:ESCALIER MENANT AU 2E: ENLEVER ET FAIRE NOUV. BASE DE BÉTON AU MÊME EMPLACEMENT.INST.NOUV.LIMONS DE BOIS, TEL QUE L'EXISTANT. AU 2E ET 3E ÉTAGE:MUR ARRIÈRE,INSTALLER NOUV.PORTES,IMPOSTES ET FENÊTRES DANS LES MÊMES OUVERTURES. RÉAMÉNAGER LES SALLES DE BAIN, RÉAMÉNAGER LA CUISINE AU 2E ÉTAGE.
INSTALLATION DE 2 FOYERS AU NIVEAU DE LA MEZZANINE A L'ARRIERE DU BAT. SANS AUTRES MODIFICATIONS
AGRANDISSEMENT A L'ARRIERE DU BATIMENT (SUR ST CHRISTOPHE), 3 ETAGES, 2 LOGEMENTS.