En façade, perron et balcon, remplacer platelage en planches de bois bouvetées et fascia bi-partie en bois; au 2e, renforcer les solives. Aucuns autres travaux.
FACADE R.C ET 2E: REMPLACER LES PLANCHERS DE LA GALERIE ET DU BALCON PAR PLANCHE BOIS BOUVETEE, FASCIA ET SOFFITE PAR PLANCHE DE BOIS, GARDE-CORPS 36" GALBE EN ACIER AVEC MAIN COURANTE EN BOIS. INSTALLER 2 COLONNES EN BOIS. REMPL. ESCALIER DU R.C. PAR ESCALIER EN BOIS ET MARCHE EN BETON T.Q.E
REAMENAGEMENT INTERIEUR DU 2E ETAGE.
REMPLACER LES APPAREILS PLOMBERIE + REAMENAGER RDC + REFAIRE BALCON DE L'ETAGE ET AJOUT D'UN PATIO AU RDC SANS MODIF.STRUCT. TEL QUE PLANS