Listing data is aggregated from public sources — evidence, not an appraisal.
No listings are recorded in this building yet.
Unit-level roll detail isn't available for this building yet. The assessment roll records it at the building level only.
Vide sanitaire en sous oeuvre, installer une nouvelle poutre centrale pour solidifier la stucture.
FAÇADE, REMPLACER 4 FENÊTRES (S-SOL:1 DE TYPE À AUVENT, RC:1 ET 2E:2 DE TYPE À BATTANT SÉPARÉ DE PETITS BOIS APPLIQUÉS CÔTÉ EXT. / INT. ET INTERCALAIRE, 3 CARREAUX PAR BATTANT.) ET 2 PORTES (VITRAGE 48" HAUT.) AVEC IMPOSTE. ARRIÈRE, REMPLACER 1 FENÊTRE. TOUS DANS LES MÊMES OUVERTURES.
DÉCAPAGE ET RÉPARATION DES JOINTS DU PAREMENT DE BRIQUE EN FACADE ET DU MUR ARRIÈRE COTÉ NORD. RÉPAR. DES JOINTS DU PAREMENT DE BRIQUE DU MUR COTÉ SUD. REMP. DE BRIQUES AU BESOIN ET DE 7 ALLÈGES À L'ARR. DÉCAPAGE ET PEINTURE DES CORNICHES AVANT ET ARRIÈRE. REMPLACER ESC. ARRIÈRE.