Listing data is aggregated from public sources — evidence, not an appraisal.
No listings are recorded in this building yet.
Unit-level roll detail isn't available for this building yet. The assessment roll records it at the building level only.
Au 3e étage, remplacer 4 fenêtres (2 sur Rachel et 2 sur Henri-Julien) par guillotine 50/50, verre clair sans motifs ni carrelage, aucun autre travail.
FAÇADES RACHEL ET HENRI-JULIEN, REJOINTOIEMENT DES JOINTS DE MORTIER DANS PARTIE SUPÉRIEURE (± 8' À 10' DE HAUT PAR PLEINE LARGEUR). SUR HENRI-JULIEN, ENLEVER BRIQUES ET INSTALLER MÊMES BRIQUES SUITE À VENTRE DE BOEUF (DESSUS FEN. DU 3E AU CENTRE). REPRODUIRE APPAREILLAGE ET MÊME COULEUR DE JOINT.
AU 3E ÉTAGE, REMPLACER 3 FENÊTRES GUILLOTINE PAR 3 FENÊTRES DU MÊME TYPE (GUILLOTINE 50/50), (2 FACE À RACHEL ET 1 FACE À HENRI-JULIEN). AUCUNE MODIFICATION AUX DIMENSIONS DES OUVERTURES.
REMPLACER 4 FENETRES GUILLOTINES D'ALUMINIUM PAR FENETRES GUILLOTINES ENPVC BLANCHES & REMPLACER PORTE DOUBLE PAR PORTE SIMPLE A VITRAGE FIXE.