Listing data is aggregated from public sources — evidence, not an appraisal.
No listings are recorded in this building yet.
Unit-level roll detail isn't available for this building yet. The assessment roll records it at the building level only.
À l'arrière, au mur latéral droit, refaire le parement de crépis sur le mur de blocs de cendre. Aucuns travaux de structure. Aucuns travaux visibles.
SUR LE TOIT AMÉNAGER UNE MEZZANINE PROLONGEANT LE LOGEMENT DU 2° ETAGE ET INSTALLER UN ESCALIER DU TOIT AU 2° ÉTAGE
CHANGER 3 PORTES EN FACADE DONT 2 AU RDC ET 1 AU 2° PAR PORTE VITRÉE 1/2-1/2 OU 2/3-1/3 AVEC IMPOSTE ET 2 PORTES À L'ARRIÈRE SANS MODIF. OUV.
SUR LE TOIT, AMENAGER UNE MEZZANINE PROLONGEANT LE LOGEMENT DU 2E ETAGE ET INSTALLER UN ESCALIER DU TOIT AU 2E ETAGE.
AU RC, ET AU 2E ETAGE, REAMENAGER LES LOGEMENTS ET INSTALLER UN ESCALIERDU 2E AU SOL.