Listing data is aggregated from public sources — evidence, not an appraisal.
No listings are recorded in this building yet.
Unit-level roll detail isn't available for this building yet. The assessment roll records it at the building level only.
EN FAÇADE ET À L'ARRIÈRE, IMPERMÉABILISER LE MUR DE FONDATION, EFFECTUER DES TRAVAUX DE DRAINAGE ET INSTALLER UN PUISARD ET UNE POMPE AU SOUS-SOL. EN FAÇADE AVANT, AU SOUS-SOL, AGRANDIR LES OUVERTURES ET INSTALLER DES MARGELLES. AU MUR ARRIÈRE, INSTALLER UNE MARGELLE. LE TOUT TEL QUE DOCUMENTS SOUMIS.
EN FAÇADE AVANT, REMPLACER QUATRE FENÊTRES DANS LES OUVERTURES EXISTANTES
REMPLACER REVÊTEMENT DE TOITURE PAR UNE NOUVELLE MEMBRANE BLANCHE
EN COUR ARRIÈRE, DÉMOLIR LE GARAGE DÉTACHÉ DU BÂTIMENT PRINCIPAL.
CONSTRUCTION D'UNE GALERIE FERMEE (VITREE) A L'ARRIERE