Listing data is aggregated from public sources — evidence, not an appraisal.
No listings are recorded in this building yet.
Unit-level roll detail isn't available for this building yet. The assessment roll records it at the building level only.
EN FAÇADE AVANT, RÉNOVER LES GARDE-CORPS AVEC DE L'ALUMINIUM SOUDÉ SUR LES 3 ÉTAGES, TEL QUE DOCUMENTS SOUMIS
ARRIÈRE AU 3E ÉTAGE, SUR MUR LATÉRAL DROIT, INSTALLER UNE NOUVELLE PORTE DANS L'OUVERTURE EXISTANTE.
REFAIRE REVÊTEMENT BRIQUE POUR BRIQUE MUR NORD AU 3E ÉTAGE, ARRIÈRE REFAIRE REVÊTEMENT BRIQUE POUR BRIQUE SUR LES 3 ÉTAGES ET MODIFIER NIVEAU RDC LES OUVERTURES ENTRE "A" ET "B" TEL QUE PLANS
RENOVATION DES HANGARS AU RDC, 2E ET 3E ETAGES A L'ARRIERE DU BAT. PHASE 1 UNIQUEMENT
REMPL. BRIQUE COTE SUD PAR BRIQUE DE 3" + 1" D'ISOLANT SANS MODIF. EPAISDU MUR (AUCUNE OUVERTURE EXISTANTE) AUCUN EMPIETTEMENT SUR VOISIN