Listing data is aggregated from public sources — evidence, not an appraisal.
No listings are recorded in this building yet.
Unit-level roll detail isn't available for this building yet. The assessment roll records it at the building level only.
EN COUR ARRIÈRE, PROCÉDER À LA RÉFECTION DU BALCON AU 2E ÉTAGE EN MODIFIANT LES DIMENSIONS EXISTANTES ET Y INSTALLER UN GARDE-CORPS D'UNE HAUTEUR DE 42 POUCES, TEL QUE DOCUMENTS SOUMIS. AUCUN TRAVAUX À L'ENVELOPPE DU BÂTIMENT ET AUCUNE MODIFICATION DES OUVERTURES.
AU 2e ÉTAGE, RÉAMÉNAGER L'AIRE DE PLANCHER EN TOUCHANT À LA STRUCTURE. AU MUR ARR, REMPLACER (1) FENÊTRE ET (1) PORTE AVEC MODIFICATION DE L'OUVERTURE. TEL QUE PLANS SOUMIS.
EN FACADE, REMPLACER LA PORTE DE 2E ÉTAGE ET REMPLACER LES 4 FENÊTRES
Au niveau du RDC, réaménagement des lieux en arrière en aire ouverte. Travaux structuraux à faire au RDC et la cave.
AU R de c, RÉNOVER LA SALLE DE BAIN.SANS CHANGEMENT DE CONFIGURATION.