Listing data is aggregated from public sources — evidence, not an appraisal.
No listings are recorded in this building yet.
Unit-level roll detail isn't available for this building yet. The assessment roll records it at the building level only.
En façade, souder des barreaux verticaux en acier sur les garde-corps de l'escalier existant afin de réduire l'espacement. Sur le garage en cour arrière, remplacer le revêtement extérieur.
AU 3È,NOUV INST L/S,ENLEVER REV SUR MUR SÉPARANT LES 2 LOG,INSONORISER+NOUV GYPSE 5/8 TYPE X,NOUV GYPSE SUR AUTRES MURS,INST LAVABO DS SB,REMPLACER 2 PORTES ENTRÉE LOG PAR PORTE 20min ÉTANCHE,REMPLACER PLANCHER BALCON MÉTAL PAR FIBRE DE VERRE.AU 2È, NOUV GYPSE 5/8 TYPE X AU PLAFOND.